Overview of the site

Lease price UF/Year
Duration Yrs
Energy production [GWh/year]
Surface ha
Add New
30(1)
74,765Gwh/year
75 ha

Status of development milestones

Currently

• 1st Land lease payment
• Access permission
• Declaration under construction (CNE)

Main portfolio characteristics

Peak capacity MWp
37,4868MWp
Solar panels
72.090
Power Solar panels
520 w
Technology
Solar-tracking structure with single north-south axis
Strings
26 panels per strings
Medium Voltage Line
30 kv
Feeder
Subestación Libienergy 400/30 KV
Distance to ST
8,70 m

The FV 37.4868MWp considers the construction of a photovoltaic that will inject all the energy generated in the 30 kV medium voltage lines of the SE Libienergy 400/30 KV feeder.

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.

Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael
Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.