Overview of the site

Lease price UF/Year
Duration Yrs
Energy production [GWh/year]
Surface ha
Add New
30(1)
51 Gwh/year
35 ha

Status of development milestones

Currently

• 1st Land lease payment
• Access permission
• Declaration under construction (CNE)

Main portfolio characteristics

Peak capacity MWp
25,116 MWp
Solar panels
38.640
Power Solar panels
650 wp
Technology
Solar-tracking structure with single north-south axis
Strings
Medium Voltage Line
30 kva/132 KV
Feeder
SET 30kV/ 132kV
Distance to ST
1,6 M
Substation (property CGE)
SET 30kV/ 132kV

The FV 25,116 MWp considers the construction of a photovoltaic that will inject all the energy generated in the 30 kV medium voltage lines of the SET 30kV/ 132kV

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.

Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael
Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.