Overview of the site

Lease price UF/Year
Duration Yrs
Energy production [GWh/year]
Surface ha
Add New
30(1)
5,963 Gwh/year
9,49 ha

Status of development milestones

Currently

• 1st Land lease payment
• Access permission
• Declaration under construction (CNE)

Main portfolio characteristics

Peak capacity MWp
2,99 Mwp
Solar panels
9.630
Power Solar panels
310 Wp
Technology
Solar-tracking structure with single north-south axis
Strings
321
Medium Voltage Line
12.5 kV
Feeder
Ajial
Distance to ST
650 m
Substation (property CGE)
Subestación Parral

The PMGD FV Esmeralda considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 12.5 kV medium voltage lines of the Ajial feeder owned by the distribution company CGE Distribución. The feeder derives from the Parral substation, owned by CGE.

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.

Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael
Peak capacity MWp
2,99 Mwp
Solar panels
7770
Power Solar panels
385 Wp
Technology
Solar tracking with single axis north - south
Strings
91
Medium Voltage Line
13.8 kV
Feeder
El Bajo
Distance to ST
3,44 Km
Substation (property CGE)
San Rafael

The PMGD FV Las Hortencias considers the construction of a 2.99
MW photovoltaic PMGD that will inject all the energy generated in the 13.8 kV medium voltage lines of the El Bajo feeder owned by the distribution company CGE Distribución. The feeder derives from the San Rafael substation, owned by CGE.